ART PROF GROUP · EXPERT GUIDE

Complete home renovation

Complete home renovation

Complete home renovation

A successful renovation starts with choices suited to your home, budget and needs. Here are the most important questions to discuss with your contractor before agreeing on a quote.

01

Survey and priorities

Check the design, moisture, roof, windows, engineering networks, insulation and traces of old interventions. Make a list of mandatory works separately from cosmetic wishes.

02

Safety of old materials

Asbestos-containing materials may be found in older homes. They cannot be identified by sight alone; if suspected, professional evaluation and compliance with dismantling rules will be required.

03

Right order.

Usually there is a survey, project, dismantling, construction work, engineering networks, insulation, alignment, finishing and installation of equipment. The plan depends on the building, but finishing before leaks are eliminated leads to repeated costs.

04

Estimates and monitoring

Ask for a breakdown by stage, a list of materials, timing, terms of change, warranties and a reserve for unforeseen defects. Fix hidden works with photos before the walls close.

05

Pre-project survey

Comprehensive repair begins with an understanding of the condition of the building: load-bearing structures, roof, humidity, windows, engineering systems, insulation. Beautiful photos of the future interior do not show hidden problems. In an old house, it is useful to collect information about previous alterations and check the state of communications.

Practical tip

Divide problems into urgent, mandatory and decorative.

06

Working arrangements

Usually, the survey and project precede the dismantling, then load-bearing structures, roofing, windows, engineering networks, insulation, surface preparation and finishing are performed. Some stages go in parallel, but the electrician and the pipes need to be coordinated before the walls close. Violation of consistency creates repeated costs.

Practical tip

Ask for a schedule with checkpoints and responsible for each stage.

07

What Hides After Decommissioning

Old buildings may show dampness, rotten elements, old wiring and dangerous materials. Asbestos cannot be reliably recognized by appearance alone; if suspected, professional evaluation and compliance with the law are required. Do not break unknown plates and insulation without checking.

Practical tip

Consider the procedure for suspending work if hazardous materials are detected.

08

Energy efficiency as part of the repair

If windows, roofs and heating are changing, it’s important to align these solutions. Quality insulation reduces the need for heat, and tightness requires ventilation. Continuous thermal insulation and moisture control are more important than the accidental purchase of the thickest insulation.

Practical tip

Ask for a single insulation and ventilation scheme for the entire house.

09

Finishing and materials

Materials are chosen for real operation: wet rooms require protection from water, hallways - resistant surfaces, living quarters - convenient care. An expensive tile on an unprepared basis does not guarantee a good result. Samples of color and texture should be approved before a large order.

Practical tip

Make a statement of materials with exact names and agreed replacements.

10

Budget management

Divide the estimate into stages and monitor the actual changes. The same-looking proposals may differ in the volume of dismantling, materials, technique and finishing. Provide a reserve for hidden defects and the procedure for agreeing additional costs. Don’t pay for untested stages just because of a calendar shift.

Practical tip

Compare the cost of the complete finished result, not the price of individual works.

11

Acceptance without passes

Before the final payment, check the documents, the operation of engineering systems, the tightness of wet areas, windows and doors, the quality of finishing and cleaning. Make a list of comments and a timeline for their elimination. Keep photos of hidden works and equipment instructions.

Practical tip

Agree the acceptance certificate with specific checks, not just a common signature.

Useful source: Official guidance ↗